top of page

Interior Design IV

semester 4

scroll

PROJECT 1 : Programming

On the first crit, I have to propose 3 ideas with the precedent studies and proposals. From these 3 proposals, the lecture chose the best proposal and proceed it to do the project 1 which (programming) and the final project (design space)

0002.jpg
0001.jpg
0003.jpg
0004.jpg
0006.jpg
0005.jpg

The lecturer chose BATIK as the main concept for the projects

0007.jpg

PROGRESSION

0009.jpg
machine.jpg

For the programming I want to create poster to describe the visual  of the programming and isometric for the machines for detailing

uda bayangan.png

Poster

Machines

Colored

00011.jpg

Major changes on the poster to describe further about the combination of machine and traditional batik.

00010.jpg

Changes on poster and isometric

0008.jpg
uda bayangan model 2.png

Additional illustration for the programming

00012.jpg

FINAL BOARD

00013.jpg

From this project, I learned that I can make illustration because this is the first time I make digital illustration. I do sketches manually and I trace the sketches on digital.

FINAL PROJECT 

The final project is applying the concept from the programming to the space. The Building is located at Tamarind Square, Cyberjaya, Malaysia. 

PROGRESSION

0005.jpg
0006.jpg

I build up the building first with sketchup based on the plan and section given

0002.jpg

Plan proposal 1

00012.jpg
00011.jpg

Plan proposal 2

Changes proposal 1

0004.jpg

After looking with the plan and section, I try to make it on sketchup for the pathway but it looks not great for the reception because can't see what is inside because it is covered by the upper floor

0007.jpg

Because the previous one didn't work out, I make the silk machine and exploring with different shapes

0001.jpg

CRIT 1

In crit 1 I still exploring the floor plan and section

After crit 1, I focused more on the shape of the machine first and later on I can determine the plan based on the machinery

0009.jpg
0008.jpg

Front facade

CRIT 2

I explore with machine making for weeks 

isometric3.png

Isometric

view2.png
view1.png
view3.png
view4.png

After crit 2, I feel like the design is not working so well, I feel that the machine is too big so the space feel very tight. Each of the machine also have different design language that were not align together so I manage to do big changes to my design.

0013.jpg
0014.jpg

I change the other 4 machine and remain 1 of the previous machine

0015.jpg

After that I arrange the machines and put the pathway to walk experience the batik. I also put the hanging batik, reception, merchandise.

After that started on the mezzanine floor

0017.jpg

Finished look on the space

01.png
03baru a.png
02b.png
04.png
05a.png
06a.png

CRIT 3

00017.jpg
THE OK ONE.jpg

Board progression

FINAL BOARD

a1.jpg
bottom of page